Các dự án thực hiện tại Việt Nam, Đông Nam Á, Ấn Độ

  • Waste water treatment Operation and maintenance of 2500KLD common. Dinh Vu Industrial Zone, Haiphong, Vietnam (Contact : Mr.Frank Wouter, Director) – Completed on 30th June 2015 – As director.
  • Design, Supply & installation of “Underground Pressure Valve sewer network” vu industrial zone, Haiphong, Vietnam. (Contact : Mr.Jasper,manager) – Completed – As director .
  • Design, Supply & installation of “Automated treated water booster station (20MLD)” at Dinh vu industrial zone, Haiphong, Vietnam. (Contact : Mr.Tim, project manager) – Completed – As director.
  • Design, Supply & installation of “Automation of sewer collection pits” at Dinh vu industrial zone, Haiphong, Vietnam. (Contact : Mr.Jasper, projectmanager) – Completed – As director.
  • Designing and consultancy for common hazardous waste treatment facility (1,00,000MT/ Annum) including ZLD plant, Nghi son Waste integratedmanagement facility, thanh hoa province, Vietnam. ( completed) .
  • Project design, monitoring of WWTP expansion from 2500KLD to 6000KLD at Dinhvu industrial zone, Haiphong, Vietnam. (Contact : Mr.Frank Wouter, GeneralDirector) – Completed – – As director.
  • Designing and consultancy for 350KLD ZLD plant in M/s Covalent laboratories, Sangareddy dt. (Contact : Mr.MN Reddy) – Completed.
  • Commissioning and O&M of LTDS stream at covalent laboratories, Sangareddy (Contact : Mr.MN Reddy) – completed.
  • Design, Supply, installation and commissioning of 70KLD ETP & RO at MSNlaboratories, Pharmachem. Unit (Contact : Mr.RavisankarReddy, EHS)- Completed
  • Refurbishment of MEE & pilot trial for biological & RO at Honour laboratories, gundla manchunoor, medak (Mr. Suresh varma,EHS) – Ongoing .
  • Design & consultancy for ZLD to M/s Astrica laboratories (Mr.Gopala Krishna, Director) – Completed.
  • Design, Supply, installation and commissioning of 120KLD ETP & RO at MSNlaboratories, rudraram. Unit 1(Contact : Mr.RavisankarReddy, EHS, 9666634608).- Completed.
  • Design, Supply, installation and commissioning of 70KLD ETP & RO at Symedlaboratories, Jeedimetla. Unit 3(Contact : Mr.Nanda chari, Director).- Completed.
  • Design, Supply, installation and commissioning of 100KLD MBR & RO at Symedlaboratories, Jeedimetla. Unit 3(Contact : Mr.Nanda chari, Director).- Completed .
  • Design, Supply, installation and commissioning of 50KLD ETP, 100KLD MBR & RO at Symed laboratories, Bonthapalli. Unit 1(Contact : Mr.Nanda chari, Director).- Completed.
  • Pilot trial on BIO ETP efficiency improvement SMS pharma (EHS Praveen).
  • Design, Supply, installation and commissioning of 50KLD ETP, MBR & RO at MSNorganics, Bibinagar. – Completed.
  • Design, Supply, installation and commissioning of 200KLD RO at Symedlaboratories, Choutappal. Unit 4(Contact : Mr.Nanda chari, Director).- Completed .
  • Pilot trials on biological degradability of waste water streams at Balaji amines, tambalwadi – on going.
  • Pilot trials on biological degradability of aste water at vamsi labs, chincholi, Sholapur.
  • Design, Supply, installation and commissioning of 50KLD ZLD at Lee pharma, Kazipalli (Contact : Mr.MVReddy, MD).- Completed.
  • Basic principle design and concept development of CETP for DEEP SEA TEXTILE PARK, Haiphong, Vietnam (contact – Mr. TIM, director) – on going .
  • Sub consultant on Basic concept plan designing of CETP & solid waste treatment facilities for HYEDERABAD PHARMACITY, Client: Surbana jurong, Singapore.
  • Design, Supply, installation and commissioning of 50KLD ETP, 100KLD MBR & RO at Almelo, hyderabad. -Completed.
  • Design, Supply, installation and commissioning of 100KLD ETP, MBR at Honourlabs, U-5, Medak.- Completed.
  • Design, Supply, installation and commissioning of 25KLD ETP at Honour labs – Hazelo – Completed.
  • Design, Supply, installation and commissioning of 50KLD ETP, MBR & RO at LeePharma Pvt Ltd, Kazipalli. (Contact : Mr. Srinivas Reddy, Project Manager).- Completed.
  • Design, Supply, installation and commissioning of 100KLD ETP, MBR & RO at Honour laboratories, gundla manchunoor, Sangareddy (Mr. Suresh varma,EHS,9705246125) – Com pleted.
  • Sub consultant on Basic concept plan designing of CETP & solid waste treatment facilities for HYEDERABAD PHARMACITY, Client: Surbana jurong/ SMEC.
  • Construction, design, Supply, installation and commissioning of 80 KLD ETP, RO at RA Chem, Jaggaipet – Completed.
  • Design, Supply, installation and commissioning of 25KLD ETP at Honour labs – Hazelo – Completed.
  • Design, Supply, installation and commissioning of 25KLD ETP at Brundavan labs – Completed.
  • Design, Supply, installation and commissioning of 25KLD ETP at Clininvent – Completed.
  • Construction, design, Supply, installation and commissioning of 80 KLD HTDS pre-treatment at RA Chem, Jaggaipet – completed.
  • Design, Supply, installation and commissioning of 100KLD ETP at maithri drug bonthapalli – On going.
  • Design, Supply, installation and commissioning of 165 KLD ETP at Pennar industries ,Isnapur – Completed.
  • Design, Supply, installation and commissioning of 65 KLD ETP at Pennar industries, Patancheru – Completed.
  • Design, Supply, installation and commissioning of 100KLD ETP at Satyadeeptha pharma, Humanabad, Karnataka – completed.
  • Design, Supply, installation and commissioning of 100KLD ETP at Balaji amines, Solapur, Maharastra– On going.
  • Design supply , Installation and commissioning of 50kld Farward osmosis along with RO system at BASIS laboratories Pvt.Ltd-Kamareddy,Telangana – ongoing.
  • Sub consultant on Basic concept plan designing of ETP facilities for Virchow laboratories Pvt Ltd at Jadcharla – On going .
  • Construction, design, Supply, installation and commissioning of 75KLD BIO ETP & 75KLD MBR System and 75KLD Three stage RO System at RAMPEX LABS, IDA Bollaram on going.
  • Design, Supply, installation and commissioning of 50KLD Aeration System At MSR INDIA ltd, Jeedimetla.
  • Design supply , Installation and commissioning of 20 kld Farward osmosis along with RO system 50KLD at ENAL DRUGS PRIVATE LIMITED, Wangapally,  Yadagirigutta on going

 